
Today the new flooring goes down. We are having a laminate floor put on top of the old floor in the conservatory. In a marked contrast the the “Sparks” that came yesterday, there has been a lot of ‘tut tut‘, ‘Oh dear‘, ‘That’s not good‘ and a fair amount of head shaking! I hadn’t realised when the boss came to give us a quote, what a misery he was. The guy with him seems a lot more laid back, with ‘Don’t worry, we can fix it‘ attitude. I’m not sure how difficult the job can be. He is an expert and, according to his van a “Which Trusted Trader”!
Anyway, they were here when the said the would be, so we shall see how it goes.
<><><><><><><>
So, we are just over 2 hours in, and the skirting is 90% done. We still have the head shaking and tutting, but I think they are getting there. Problem has been that when the patio door was removed, it left a gap in the floor which was more or less bare brickwork. Trying to level the floor has been quite a task.
The boss has just ‘nipped back to base’ to get something that they need. I would have thought they should have everything basic, so it must be something special for this job. But hey, what do I know.

He’s back now, with the comment ‘Some people just moan about anything’. The colour of pots and kettles sprung to mind. They are now having a ‘tea and chat’ break, so I’ve now idea how long this is going to take.
<><><><><><><>
Lunch break is now over and the floor laying has begun. This going a lot faster than the previous 4 hours! Although both are now on their 4th cuppa!
<><><><><>

It looks like they are almost done. That will make it 7½ hours in total or about 5 hours if you take out the chat/drink/lunch time. It looks good though and it means that we now have a room we can use all year round, instead of just the warm days in middle of summer.